Customer: Total

Coimec, a company specializing in thermal insulation, plant and scaffolding activities, faced a significant challenge when it was contracted to provide key services for the New TOTAL Refinery project in Tempa Rossa, Basilicata, Italy. The main challenge was to ensure operational efficiency, workplace safety and quality performance in a highly specialized and high-risk environment.

Project information

Project type
Raffineria
Date
2015
Where
Basilicata - Italy

Project

Coimec approached this challenge methodically, following a series of key actions:

Detailed planning: Before beginning any field work, Coimec conducted extremely detailed planning. This included defining the specifications of the thermal insulation, design of the systems and scaffolding, and risk assessment.

Training and safety: Safety was a top priority. The company ensured that all personnel were properly trained and equipped to work safely in the complex refinery environment. Strict procedures were established to prevent accidents.

Quality materials and technologies: Coimec used high-quality thermal insulation materials to ensure that energy efficiency was maximized and that the insulation could withstand the extreme conditions of the refinery. In addition, state-of-the-art technologies were used to install the equipment.

Collaboration with Total: Coimec established a close collaboration with Total, the client of the project. This allowed clear and continuous communication, enabling the company to respond promptly to the client's needs and changes. Constant quality control: Coimec implemented a rigorous quality control system. Each phase of the project was monitored and verified to ensure that quality standards were met consistently.

Result

Through their careful planning and commitment to safety and quality, Coimec was able to achieve significant results in the New TOTAL Refinery project in Tempa Rossa: The project was completed on time and in line with the client's expectations. No accidents or injuries were reported throughout the project, demonstrating the constant focus on safety. The thermal insulation helped improve energy efficiency and plant performance, reducing long-term operating costs. Customer satisfaction was very high, paving the way for further collaboration. This successful case demonstrates the importance of planning, safety and quality when dealing with complex projects such as the New TOTAL Refinery in Tempa Rossa. Coimec has demonstrated its ability to excel in a highly specialized and high-risk environment.