Coimec approached this challenge methodically, following a series of key actions:
Detailed planning: Before beginning any field work, Coimec conducted extremely detailed planning. This included defining the specifications of the thermal insulation, design of the systems and scaffolding, and risk assessment.
Training and safety: Safety was a top priority. The company ensured that all personnel were properly trained and equipped to work safely in the complex refinery environment. Strict procedures were established to prevent accidents.
Quality materials and technologies: Coimec used high-quality thermal insulation materials to ensure that energy efficiency was maximized and that the insulation could withstand the extreme conditions of the refinery. In addition, state-of-the-art technologies were used to install the equipment.
Collaboration with Total: Coimec established a close collaboration with Total, the client of the project. This allowed clear and continuous communication, enabling the company to respond promptly to the client's needs and changes. Constant quality control: Coimec implemented a rigorous quality control system. Each phase of the project was monitored and verified to ensure that quality standards were met consistently.